TAKE OFF SHEET JALAN RABAT BETON_1

★ TAKE OF SHEET PEKERJAAN JALAN RABAT BETON LOKASI DUSUN LAMDAN - GAMPONG LAM HASAN KECAMATAN PEUKAN BADA KABUPATEN ACEH BESAR ★

Note: The column-count property is not supported in Internet Explorer 9 and earlier versions.

GAMBAR
URAIAN
VOLUME
SATUAN
HARGA
,,,,,,,,,,,,GAMBAR PEKERJAAN...............
P1.0 - 38.00 m :
Volume
panjang = 38.00 m
Lebar = 2.00 m
Tinggi = 0.20 m
P 38.00 - 41.60 m :
Volume
panjang = 3.60 m
Lebar = 2.00 m
Tinggi = 0.20 m
P 2. 41.60 - 171.50 m :
Volume
panjang = 129.90 m
Lebar = 3.60 m
Tinggi = 0.20 m
1 M2 PEKERJAAN RABAT BETON
UPAH
Pekerja = 1.093 OH x 77.318.18 = 84.507.30
Tukang = 0.182 OH x 96.095.45 = 17.505.00
Kepala Kelompok = 0.031 OH x 84.100 = 2.565.39
JUMLAH = 104.577.77
BAHAN
Semen = 3.669 Zak x 57.436.00 = 210.708.55
Pasir Pasang = 0.329 m3 x 162.500.00 = 53.391.71
Pasir Urug = 0.051 m3 x 162.500.00 = 8.214.11
Kerikil = 0.446 m3 x 110.455.00 = 49.289.07
JUMLAH = 321.603.43
REKAPITULASI HARGA
UPAH = 104.577.77 x 110.17 M3 = 11.521.124.00
BAHAN = 321.603.43 x 110.17 M3 = 35.430.407.00
PAPAN DELETASI = 77.318.00 x 23.00 Lbr = 1.778.314
Rab / Desain = 1.500.000.00 x 1.00 Bh = 1.500.000.00
Pamplet = 400.000.00 x 1.00 Bh = 400.000.00
JUMLAH = 50.629.845.00

Take Of Sheet Rehab PAUD

★ TAKE OF SHEET PEKERJAAN REHAP PAUD LOKASI DUSUN PAYA LOE GAMPONG LAM HASAN KECAMATAN PEUKAN BADA KABUPATEN ACEH BESAR ★

Note: The column-count property is not supported in Internet Explorer 9 and earlier versions.

GAMBAR
URAIAN
VOLUME
SATUAN
HARGA
,,,,,,,,,,,,GAMBAR PEKERJAAN...............
1 M3 BONGKARAN PASANGAN LAMA
Volume Bongkaran = 11.32 M3
Pekerja = 2.00 OH x 77.318.00 = 154.636.36
Tukang = 0.00 OH x 96.095.45 = 0.00
Kepala Tukang = 0.00 OH x 95.400.00 = 0.00
Mandor = 0.10 OH x 84.100 = 8.410.00
Jumlah Volume = 11.32 M3 X 163.046.36 = 1.844.870.00
,,,,,,,,,,,,GAMBAR PEKERJAAN...............
MEMASANG KOSEN KAYU KLAS I
Volume = 3.64 M3
Pekerja = 6.00 OH x 77.318.00 = 463.909.09
Tukang = 18.00 OH x 96.095.45 = 0.00
Kepala Tukang = 2.00 OH x 95.400.00 = 190.800.00
Mandor = 0.30 OH x 84.100 = 0.00
JUMLAH UPAH = 654.709.09
Kosen = 3.643 M3 x 1.092.650.17 = 3.980.348.97
Paku Kayu = 0.12 Kg x 13.254.55 = 1.590.55
Lem kayu = 0.100 Kg x 35.000 = 3.500
JUMLAH BAHAN = 3.985.439.52
,,,,,,,,,,,,GAMBAR PEKERJAAN...............
MEMASANG 1 BH PACOK JENDELA
Volume = 16.00 BH
Pekerja = 0.015 OH x 77.318.00 = 1.159.77
Tukang = 0.00 OH x 96.095.45 = 0.00
Kepala Tukang = 0.00 OH x 95.400.00 = 0.00
Mandor = 0.00 OH x 84.100 = 0.00
Pacok Jendela = 1 Bh x 7.652.73 = 7.652.73
JUMLAH I + II = 8.812.50
Jumlah Volume = 16.00 BH X 8.812.50 = 141.000.00
,,,,,,,,,,,,GAMBAR PEKERJAAN...............
MEMASANG 1 BH HAK ANGIN
Volume = 16.00 BH
Pekerja = 0.015 OH x 77.318.00 = 1.159.77
Tukang = 0.00 OH x 96.095.45 = 0.00
Kepala Tukang = 0.00 OH x 95.400.00 = 0.00
Mandor = 0.00 OH x 84.100 = 0.00
Hak Angin = 1 Bh x 29.767.48 = 29.767.48
JUMLAH I + II = 30.927.25
Jumlah Volume = 16.00 BH X 30.927.25 = 494.936.04
,,,,,,,,,,,,GAMBAR PEKERJAAN...............
MEMASANG 1 BH ENGSEL JENDELA
Volume = 16.00 BH
Pekerja = 0.015 OH x 77.318.00 = 1.159.77
Tukang = 0.00 OH x 96.095.45 = 0.00
Kepala Tukang = 0.00 OH x 95.400.00 = 0.00
Mandor = 0.00 OH x 84.100 = 0.00
Engsel Jendela = 1 Bh x 28.663.00 = 28.663.00
JUMLAH I + II = 29.822.77
Jumlah Volume = 16.00 BH X 29.822.77 = 477.164.36
,,,,,,,,,,,,GAMBAR PEKERJAAN...............
MEMBUAT 1 UNIT CANOPI JENDELA
Volume = 3.00 UNIT
Balok Meranti = 4.152 m2 x 65.000.00 = 269.909.45
Paku kayu = 0.120 Kg x 13.254.55 = 1.590.55
Lem Kayu = 0.100 Kg x 35.000.00 = 3.500.00
JUMLAH = 303.875.00
Jumlah Volume = 3.00 BH X 275.000.00 = 825.000.00
,,,,,,,,,,,,GAMBAR PEKERJAAN...............
1 M2 MEMBUAT SEKAT RUANGAN KELAS
Volume = 274.59 M2
UPAH
Pekerja = 0.100 OH x 77.318.00 = 7.731.82
Tukang = 0.10 OH x 96.095.45 = 0.00
Kepala Tukang = 0.01 OH x 95.400.00 = 954.00
Mandor = 0.00 OH x 84.100 = 0.00
JUMLAH = 8.685.82
JUMLAH 274.59 M2 X 8.685.82 = 2.385.000.00
BAHAN
Balok Kayu 5 x 5 = 0.031 m2 x 68.220.00 = 2.107.73
Paku Kayu = 0.007 Kg x 13.255.00 = 96.76
Triple 9 mm = 0.015 Lbr x 143.591.00 = 2.153.87
Baut 9 mm = 0.004 bh x 2.209.00 = 8.84
Paku Beton = 0.004 bh x 442.00 = 1.77
JUMLAH = 4.368.96
JUMLAH 274.59 M2 X 4.368.96 = 1.199.651
,,,,,,,,,,,,GAMBAR PEKERJAAN...............
1 M2 MEMBERSIHKAN KERIKIL
Volume = 25.13 M2
UPAH
Pekerja = 0.100 OH x 77.318.00 = 7.731.82
Mandor = 0.05 OH x 84.100 = 4.205.00
JUMLAH = 11.936.82
JUMLAH 25.13 M2 X 11.936.82 = 300.000
,,,,,,,,,,,,GAMBAR PEKERJAAN...............
1 M2 PEKERJAAN PENGECATAN TEMBOK
Volume = 236.83 M2
UPAH
Pekerja = 0.02 OH x 77.318.00 = 1.546.36
Tukang = 0.063 OH x 96.095.45 = 6.054.01
Kepala Tukang = 0.006 OH x 95.400.00 = 0.00
Mandor = 0.00 OH x 84.100 = 0.00
JUMLAH = 7.600.38
JUMLAH 236.83 M2 X 7.600.38 = 1.800.000.00
BAHAN CAT TEMBOK
Cat Tembok = 0.108 Kg x 29.602.00 = 3.183.72
Dempul = 0.01 Kg x 22.091.00 = 220.891
JUMLAH = 3.404.63
JUMLAH 236.83 M2 X 3.404.63 = 806.321.00
BAHAN CAT MINYAK
Cat Minyak = 1.221 Kg x 29.602.00 = 36.144.04
Thinner = 0.02 Ltr x 26.509.00 = 530.18
JUMLAH = 36.674.22
JUMLAH 18.21 M2 X 36.674.22 = 658.335.00
ALAT BANTU
Amplas = 10.00 m x 2.651.00 = 26.510.00
Scrabs 3" = 2.00 Bh x 11.045.00 = 22.090.00
Kuas 3" = 4.00 Bh x 19.882.00 = 79.528.00
Kuas 2" = 4.00 Bh x 14.359.00 = 57.436.00
Kuas 1/2" = 4.00 Bh x 12.150.00 = 46.600.00
JUMLAH = 234.164.00
,,,,,,,,,,,,GAMBAR PEKERJAAN...............
KEBUTUHAN BAHAN SENG ONDUINE
Volume = 8.00 lembar
BAHAN
Sengan Onduline = 1.00 Lbr x 57.436 = 57.436
Baut = 6.25 Bh x 700.00 = 4.375.00
JUMLAH = 61.811.00
JUMLAH 8.00 lbr X 61.811.00 = 494.488.00
,,,,,,,,,,,,GAMBAR PEKERJAAN...............
MEMASANG 1 UNIT POMPA AIR
Volume = 1 UNIT
BAHAN
POMPA PANASONIC = 1 UNIT x 717.955.00 = 717.955.00
Soft Kran = 1 Bh x 19.882.00 = 19.882.00
Pipa 3/4 = 4.00 Btg x 27.614.00 = 110.456.00
Elbow 3/4 = 1.00 Bh x 8.836.00 = 8.836.00
Lem Pipa = 1.00 Bh x 13.255.00 = 13.255.00
Seal Tape = 1.00 Bh x 8.836.00 = 8.836.00
JUMLAH = 879.220.00
,,,,,,,,,,,,GAMBAR PEKERJAAN...............
PENGADAAN PENGAMAN POMPA AIR
Volume = 1.00 UNIT
Pengaman Besi = 1.00 UNIT x 497.045.00 = 497.045.00

TOS Plat Beton

★ TAKE OF SHEET PEKERJAAN PLAT BETON SEBANYAK 3 UNIT DI DUSUN LAMPOH RAYA 2 UNIT DAN KOMPLEK DHARMA SAKINAH 1 UNIT DI GAMPONG LAM HASAN KECAMATAN PEUKAN BADA KABUPATEN ACEH BESAR ★

Note: The column-count property is not supported in Internet Explorer 9 and earlier versions.

GAMBAR
URAIAN
VOLUME
SATUAN
HARGA
PLAT BETON (BESI BETON POLOS D. 12 MM)
Jumlah = 1.00 Unit
Panjang = 2.80 m
Tebal = 0.45 m
Lebar Plat = 1.50 m
Volume Plat (I) = 1.89 M3
PLAT BETON (BESI BETON POLOS D. 10 MM)
Jumlah = 2.00 Unit
Panjang = 4.50 m
Tebal = 0.30 m
Lebar Plat = 2.18 m
Volume Plat (I) = 5.89 M3
VOLUME (I) + (II) = 7.78 M3
SNI. 6.5.2 (REV) 1 M3 BETON COR
UPAH
pekerja = 1.65 OH x 77.318.18 = 127.575.00
Tukang = 0.250 OH x 96.095.45 = 0.00
Kepala Tukang = 0.025 OH x 95.400.00 = 2.385.00
Mandor = 0.060 OH x 84.100.00 = 5.046.00
BAHAN
Semen PC = 5.80 Zak x 57.436.36 = 333.130.91
Pasir Pasang = 0.52 M3 x 151.875.00 = 78.975.00
Kerikil = 0.87 M3 x 110.454.55 = 96.095.45
Mandor = 0.060 OH x 84.100.00 = 5.046.00
JUMLAH Rp. =643.207.36
1 KG PEMBESIAN DENGAN BESI POLOS
UPAH
pekerja = 0.007 OH x 77.318.18 = 541.23
Tukang = 0.007 OH x 0.00 = 0.00
Kepala Tukang = 0.0007 OH x 95.400.00 = 66.78
Mandor = 0.0003 OH x 84.100.00 = 25.23
BAHAN
Besi Beton Polos = 1.050 Kg x 62.959.09 = 66.107.05
Kawat Ikat = 0.015 Kg x 8.836.00 = 132.54
JUMLAH Rp. =66.872.82

VOLUME BESI D.12 DHARMA SAKINAH

P.besi = 12 mm

V.h = (2.8+0.35+0.1+0.35+0.1+2.8) = 6.50 m x 10 bh = 65.00 meter / 12 meter = 5.42 btg

V.l = (1.5+0.1+1.5+0.1+1.5+0.1+1.5+0.1) = 6.40 m x 22 bh = 140.80 meter / 12 meter = 11.73 btg

P.besi = 10 mm

V.h = (1.80+0.20+0.15+1.80+0.20+0.15) = 5.06 m

= 4.50 m / 0.14 m = 32.14 x 5.06 m = 162.64 meter = 13.554 btg

Jml Besi = 26 btg x 2 unit = 52.80 btg

REKAP KEBUTUHAN ANGGARAN
pekerja = 56.9115 OH x 77.318.18 = 4.428.000
Kepala Tukang = 48.035 OH x 85.400 = 4.102.200
Kerikil = 2.00 M3 x 110.455 = 220.910
Pasir Pasang = 3.00 M3 x 151.875 = 455.625
Semen PC = 84 Zak x 57.436 = 4.824.624
Besi Beton d 12 = 39.00 Btg x 75.000 = 2.932.800
Besi Beton d 10 = 52.00 Btg x 62.959 = 3.273.868
Kawat Beton = 15 Kg x 9.936 = 132.540
Plywood 9 mm = 8.00 Lbr x 143.591 = 1.148.728
Kayu 5 x 5 = 10 Btg x 56.227 = 562.270
Paku Kayu = 3.00 Kg x 13.255 = 39.765
Desain / RAB = 1.00 Bh x 500.000 = 500.000
Pamplet = 1 bh x 400.000 = 400.000
JUMLAH Rp. =23.021.330

TAKE OF SHEET BAHU JALAN

★ TAKE OF SHEET PEKERJAAN BAHU JALAN SEPANJANG 1.260 METER DI DUSUN BTN, KOMPLEK DHARMA SAKINAH, DAN DUSUN LAMPOH RAYA DAN KOMPLEK POLA PERMAI ★

GAMBAR
URAIAN
VOLUME
SATUAN
HARGA

Ket :
Panjang = 1.260 meter
Ketebalan = 10 ~ 15 cm
Volume = 252.25 m3

1. UPAH

Pekerja = 0.357 Oh x 77.318.18 = 27.587.30
Tukang = 0.00 Oh x 96.095.00 = 0.00
Kepala Tukang = 0.025 Oh x 95.400.00 = 2.420.63
Mandor/Kepala Kelompok = 0.012 Oh x 84.100.00 = 1.000.00
JUMLAH (I) = 31.007.94
II. BAHAN
Semen = 0.315 Zak x 57.436.00 = 18.063.49
Pasir Pasang = 0.0611 m3 x 162.500.00 = 9.920.63
Pasir Urug = 0.0248 m3 x 162.500.00 = 4.023.81
Kerikil = 0.0402 m3x 110.455.00 = 4.444.44
JUMLAH (II) = 67.460.32
REKAP KEBUTUHAN BIAYA
Kebutuhan Upah (I) 31.007.94 x 1.260 m = 39.070.000
Kebutuhan bahan(II) 36.452.38 x 1.260 m = 45.930.000
Batu Mangga 4.00 M3 x 124.000 = 496.000
Papan Deletasi 30 Lbrx 77.318 = 2.319.540
Balok 5 x 5 8 lbr x 68.000= 544.000
Kereta Sorong 1 Unit x 446.000 = 446.000
Paku = 2.00 Kg x 13.255 = 26.510
Raskam = 2 bh x 8.920 = 17.840
Timba = 4 bh x 6.690 = 26.760
Sapu Lidi = 1.00 bh x 11.150 = 11.150
Cangkul = 1.00 bh x 71.795 = 71.795
Skop = 1.00 bh x 71.795 = 71.795
Pangki = 2.00 bh x 18.500 = 37.000
Rab dan Desain = 1.00 bh x 1.500.000 = 1.500.000
Pamplet = 1.00 bh x 400.000 = 400.000
TOTAL BIAYA PEKERJAAN = 90.968.390

SILAHKAN KLIK PADA TULISAN PEKERJAAN


KLIK PADA TULISAN PEKERJAAN YANG INGIN DILIHAT


KETERANGAN
Menyusun Kelengkapan Laporan
Selesai
Sedang tahap Penyelesaian

REALISASI TAHAP I

Upload By Sierra

REALISASI TAHAP - I 2017

Definisi dan Jenis

REALISASI PEKERJAAN TAHUN 2017 TAHAP - I
  1. Pembayaran Jerih / honor / Tunjangan
  2. Pembayaran Honor PTPKG
  3. Operasional Perkantoran
  4. Pembayaran Dhalail Khairat
  5. Pembayaran TranportRaskin
  6. Pekerjaan Bahu Jalan
  7. Pekerjaan Peningkatan Jalan
  8. Pekerjaan Pemasangan Lampu Jalan (rev)
  9. Administasi dan Pelaksanaan TPA(rev)
  10. Pekerjaan Rehab Saluran (rev)
  11. Pekerjaan Rehab PAUD
  12. Pekerjaan Plat Beton
  13. Pekerjaan Adm dan Pendidikan PAUD
  14. PROSES UPLOAD
  15. Pekerjaan Jalan Rabat
  16. Santunan Kepada Anak Yatim
  17. Pekerjaan Peringatan HUT RI ke - 72

DAFTAR HONOR/JERIH APARATUR GAMPONG


URAIAN SAT @ FLAFOND REALISASI SISA PPn/PPh Ket
Keuchik 1 org x 12 1.000.000 12.000.000 6.000.000 6.000.000 - ADG
Sekdes 1 org x 12 700.000 4.200.000 8.400.000 4.200.000 - ADG
Kaur 3 org x 12 500.000 18.000.000 9.000.000 9.000.000 - ADG
Kadus 7 org x 12 500.000 42.000.000 21.000.000 21.000.000 - ADG
Imum Menasah 1 org x 12 500.000 6.000.000 3.000.000 3.000.000 - ADG
Jumlah86.400.00043.200.00043.200.000--

DAFTAR KEUANGAN PEMBAYARAN TUNJANGAN YANG TELAH DIREALISASIKAN Januari s/d Juni 2017 Per 4 September 2017

URAIAN SAT @ FLAFOND REALISASI SISA PPn/PPh Ket
Keuchik 1 org x 12 500.000 6.000.000 3.000.000 3.000.000 - ADG
Sekdes 1 org x 12 200.000 2.400.000 1.200.000 1.200.000 - ADG
Kaur 3 org x 12 100.000 3.600.000 1.800.000 1.800.000 - ADG
Kadus 7 org x 12 100.000 8.400.000 4.200.000 4.200.000 - ADG
Imum Menasah 1 org x 12 100.000 1.200.000 600.000 600.000 - ADG
Tuha Peut 1 org x 12 500.000 6.000.000 3.000.000 3.000.000 - ADG
Sekr.Tuha Peut 1 org x 12 400.000 4.800.000 2.400.000 2.400.000 - ADG
Ang.Tuha Peut 6 org x 12 300.000 21.600.000 10.800.000 10.800.000 - ADG
Bendahara 1 org x 12 500.000 6.000.000 3.000.000 3.000.000 - ADG
Op.Profil 1 org x 12 300.000 3.600.000 1.800.000 1.800.000 - ADG
Guru Ngaji 1(5)org x 12 500.000 6.000.000 3.000.000 3.000.000 - ADG
Jumlah69.600.00034.800.00034.800.000--

2.1.3.3 PELAKSANAAN OPERASIONAL KANTOR YANG TELAH DIREALISASIKAN TAHAP - I

URAIAN SAT @ FLAFOND REALISASI Saldo PPn/PPh Ket
Mix Wireless Rec. jinjing 1 unit 6.000.000 6.132.500 6.000.000 132.500 627.273 DD
Kursi Plastik 80 unit 111.500 9.053.800 8.920.000 133.800 940.909 DD
Wajan/Kuali Besi 6 Unit 1.895.500 11.373.000 11.373.000 0 1.188.995 DD
Dandang Besar 3 Unit 900.000 2.740.700 2.700.000 40.700 286.528 DD
Jumlah29.300.00028.993.000307.0003.043.705-

DAFTAR PEMBAYARAN PTPKG YANG TELAH DIREALISASIKAN JANUARI s/d SEPTEMBER 2017

URAIAN SAT @ FLAFOND REALISASI SISA PPn/PPh Ket
Peng.Anggaran 1 org x 8 bln 400.000 3.200.000 1.600.000 1.600.000 334.545 DD
Koordinator 1 org x 8 bln 300.000 2.400.000 1.200.000 1.200.000 250.909 DD
Pel.Keg 1 org x 8 Bln 200.000 1.600.000 800.000 800.000 167.273 DD
Bend. 1 org x 8 Bln 200.000 1.600.000 800.000 800.000 167.273 DD
Jumlah8.800.0004.400.0004.400.000920.000-

DAFTAR PEMBAYARAN DALAIL KHAIRAT YANG TELAH DIREALISASIKAN JANUARI s/d SEPTEMBER 2017

URAIAN SAT @ FLAFOND REALISASI SISA PPn/PPh Ket
makan Minum Anggota 30 org x 12bln 15.000 4.400.000 1.100.000 3.300.000 - ADG
Jumlah4.400.0001.100.0003.300.000--

DAFTAR PEMBAYARAN TRANPORT RASKIN DIREALISASIKAN JANUARI s/d SEPTEMBER 2017

URAIAN SAT @ FLAFOND REALISASI SISA PPn/PPh Ket
OP Raskin 270 Kg x 12 150 486.000 243.000 243.000 - ADG
Jumlah486.000243.000243.000--

PEKERJAAN BAHU JALAN SEPANJANG 1.260 M

URAIAN Vol Sat Harga @ Flafon Realisasi Saldo PPn + PPh Ket
UPAH
Pekerja 471.00 Oh 73.800 34.760.000 34.760.000 0 0 DD
Kepala Tukang 32.00 Oh 95.400 3.052.800 3.050.000 2.800 0 DD
Kepala Kelompok 15.00 Oh 84.100 1.261.500 1.260.000 1.500 0 DD
Desain dan Rab 1 bh 1.500.000 1.500.000 1.500.000 0 0 DD
BELANJA BAHAN
Semen PC @40 Kg/Zak 396.28 Zak 57.436 22.760.700 22.760.000 700 2.379.528 DD
Pasir Beton 76.93 M3 162.500 12.501.700 12.500.000 1.700 170.478 DD
Pasir Urug 31.23 M3 162.500 5.075.200 5.070.000 5.200 69.207 DD
Kerikil 50.87 M3 110.455 5.619.200 5.600.000 19.200 76.625 DD
Batu Mangga 4 M3 124.000 497.045 497.000 45 6.678 DD
Papan Deletasi 30.00 Lbr 77.831 2.319.545 2.310.000 9.545 242.498 DD
Balok 5 x 5 8.00 Btg 68.000 544.000 544.000 0 56.873 DD
Kereta Sorong 1.00 Unit 446.000 446.000 446.000 0 46.627 DD
Paku Kayu 2.00 Kg 13.255 26.508 26.000 508 2.771 DD
Raskam 2.00 Bh 8.920 17.840 17.000 840 1.865 DD
Timba 4.00 Bh 6.690 26.760 26.000 760 2.798 DD
Sapu lidi 1 Bh 11.150 11.150 11.000 150 1.168 DD
Cangkul 1 Bh 71.795 71.795 70.000 1.795 7.506 DD
sKOP 1 Bh 71.795 71.795 70.000 1.795 7.506 DD
Pangki 2 Bh 18.500 37.000 37.000 0 3.868 DD
Pamplet 1 unit 400.000 400.000 400.000 0 0 DD
Jumlah90.968.39090.921.85246.5383.076.094-

PEKERJAAN PENINGKATAN JALAN SEPANJANG 82 x 3 METER

URAIAN Vol Sat Harga @ Flafon Realisasi Saldo PPn + PPh Ket
UPAH
Pekerja 34.00 Oh 73.800 2.509.200 2.500.000 9.200 - DD
BELANJA BAHAN
Tanah Cadas/Tanah Kasar 64.00 M3 82.841 5.301.818 5.300.000 1.818 72.298 DD
Kerikil 36 M3 110.455 3.976.364 3.976.000 6.364 54.223 DD
Buis Beton 2.00 unit 182.250 364.500 364.000 500 38.107 DD
Jumlah11.654.00011.489.37317.882164.627-

PEKERJAAN PEMASANGAN LAMPU JALAN

URAIAN Vol Sat Harga @ Flafon Realisasi Saldo PPn + PPh Ket
Lampu Jalan 14.00 Titik 408.362 5.721.545 5.720.000 1.545 597.000 DD
Jumlah5.721.5455.720.0001.545597.000-

Administrasi Taman Pendidikan Al - Qur'an (TPA)

URAIAN Vol Sat Harga @ Flafon Realisasi Saldo PPn + PPh Ket
BELANJA BARANG DAN JASA
Cetak Buku Raport 100.00 ex 5.000 500.000 500.000 0 52.273 DD
Cetak Buku Pemantau 100 Ex 5.000 500.000 500.000 0 52.273 DD
Papan Tulis WB 4 unit 275.000 1.100.000 1.100.000 0 115.000 DD
Spidol WB 2.00 Lsn 84.000 168.000 168.000 0 17.564 DD
Buku Folio 100 lbr 5.00 bk 18.000 90.000 90.000 0 9.409 DD
Jerih Guru TPA 6 orgx12bln 75.000 5.400.000 3.150.000 2.250.000 0 DD
Akte OP Izin TPA 1.00 Ex 1.000.000 1.000.000 1.000.000 0 0 DD
Jumlah8.758.0006.508.0002.250.000246.518-

PEKERJAAN REHAB SALURAN SEPANJANG 12 METER

URAIAN Vol Sat Harga @ Flafon Realisasi Saldo PPn + PPh Ket
UPAH
Pekerja 7.76 Oh 77.318 600.000 600.000 0 0 DD
BELANJA BAHAN
Pasir Pasangan 1.00 M3 162.500 162.500 162.500 0 2.216 DD
Balok Kayu 5 x 5 7 Btg 55.227 386.591 386.591 0 40.416 DD
Semen 10.00 Zak 57.436 574.364 574.364 0 60.047 DD
Papan Cor 5.00 Lbr 77.318 386.591 386.591 0 40.416 DD
Jumlah2.110.0452.110.0450143.096-

PEKERJAAN REHAB GEDUNG PAUD

URAIAN Vol Sat Harga @ Flafon Realisasi Saldo PPn + PPh Ket
BELANJA UPAH PEKERJA PEKERJAAN
Pembongkaran Pas.Lama 23.60 Oh 77.318 1.845.000 1.845.000 0 0 DD
Pemas. Pintu, kanopi, Kosen 30.85 Oh 77.318 2.385.000 2.385.000 0 0 DD
Sekat ruang, kunci, sanyo 27.19 Oh 77.318 2.102.500 2.102.500 0 0 DD
Membersihkan kerikil 3.88 Oh 77.318 300.000 300.000 0 0 DD
Pengecatan tembok, kosen 23.28 Oh 77.318 1.800.000 1.800.000 0 0 DD
Desain dan Rab 1.00 Bh 3.000.000 3.000.000 3.000.000 0 0 DD
BELANJA MODAL DAN BAHAN KOSEN JENDELA
Kosen Jendela 39.00 M 102.539 3.998.893 3.990.000 8.893 418.066 DD
Daun Jendela + Kaca 8.00 Lbr 330.875 2.676.000 2.676.000 0 279.764 DD
Rangka Canopi Jendela 3.00 Psg 303.750 825.000 825.000 0 86.250 DD
Pacok Jendela 16 Psg 8.836 141.382 141.000 382 14.781 DD
Hak Angin 16 Psg 30.927 494.836 494.800 36 51.733 DD
Engsel Jendela 16 Psg 29.823 477.164 477.164 164 49.885 DD
BELANJA MODAL DAN BAHAN SEKAT DINDING RUANGAN
Balok Kayu 5 x 5 8 Btg 68.220 545.760 545.700 60 57.057 DD
Paku kayu 2 Kg 13.255 26.509 26.509 0 2.771 DD
Triplek 4.00 Lbr 143.591 574.364 574.364 0 60.047 DD
Baut 9 mm 20.00 bh 2.209 44.182 44.182 0 4.619 DD
Paku Beton 20.00 bh 442 8.836 8.836 0 924 DD
BELANJA MODAL DAN BAHAN CAT DAN KUAS
Cat Minyak 10.00 Kg 55.227 552.273 552.273 0 57.738 DD
Cat Tembok 25 Kg 29.602 740.045 740.045 0 77.368 DD
Kuas 3 " 4.00 bh 19.882 79.527 79.527 0 8.314 DD
Kuas 2 " 4.00 bh 14.359 57.436 57.436 0 6.005 DD
Kuas 1 1/2 " 4.00 bh 12.150 48.600 48.600 0 5.081 DD
Thinner 4.00 ltr 26.509 106.036 106.036 0 11.086 DD
Amplas 10.00 m 2.651 26.509 26.509 0 2.771 DD
Dempul 3.00 Kg 22.091 66.273 66.273 0 6.929 DD
Scrab 3" 2.00 bh 11.045 22.091 22.091 0 2.310 DD
BELANJA MODAL DAN BAHAN SENG ONDULINE CANOPI
Seng Onduline 8.00 Lbr 57.436 459.491 459.491 0 48.038 DD
Baut 4/8 x 4 50 bh 700 35.000 35.000 0 2.659 DD
BELANJA MODAL DAN BAHAN POMPA AIR DAN ACCESORIES
Pompa Air Panasonic 1.00 unit 717.955 717.955 717.955 0 75.059 DD
Soft Kran 1 bh 19.882 19.882 19.882 0 2.079 DD
Pipa 3/4 1 bh 27.614 27.614 27.614 0 2.887 DD
Elbow 3/4 4 btg 8.836 35.345 35.345 0 3.695 DD
Lem Pipa 1 bh 13.255 13.255 13.255 0 1.386 DD
Seal Tape 1 bh 8.836 8.836 8.836 0 924 DD
Pengaman Pompa 1 unit 497.045 497.045 497.045 0 51.964 DD
BELANJA MODAL PAPAN INFORMASI PAUD
Papan Informasi Siap 1.00 unit 2.700.000 2.700.000 2.700.000 0 282.273 DD
Pamplet 1.00 unit 300.000 300.000 300.000 0 31.364 DD
Jumlah27.758.00027.331.263418.0001.675.460-

PEKERJAAN PLAT BETON 3 UNIT

URAIAN Vol Sat Harga @ Flafon Realisasi Saldo PPn + PPh Ket
BELANJA UPAH
Pekerja 56.915 Oh 77.800 4.428.000 4.428.000 0 0 DD
Kepala Tukang 48.03 Oh 95.400 4.102.200 4.102.200 0 0 DD
Desain dan Rab 1 bh 500.000 500.000 500.000 0 0 DD
Pamplet 1 bh 346.357 346.357 346.357 0 0 DD
BELANJA MODAL DAN BAHAN
Kerikil Beton 2.00 M3 110.455 220.909 220.909 0 3.012 DD
Pasir Beton 3.00 M3 151.875 455.625 455.625 0 6.213 DD
Semen PC @ 40 Kg / Zak 84 Zak 57.436 4.824.624 4.824.624 0 504.393 DD
Besi Beton Polos D.12 mm 39 Btg 75.200 2.932.800 2.932.800 0 306.611 DD
Besi Beton Polos D.10 mm 52 Btg 62.959 3.273.868 3.273.868 0 342.268 DD
Kawat Beton 15.00 Kg 8.836 132.540 132.540 0 13.856 DD
Plywood 9 mm 8.00 Lbr 143.591 1.148.728 1.148.728 0 120.094 DD
Kayu Stut 10.00 Btg 56.227 562.270 562.270 0 58.783 DD
Paku Kayu 3.00 Kg 13.255 39.765 39.765 0 4.157 DD
Jumlah23.021.33023.021.33001.359.388-

PEKERJAAN PENDIDIKAN DAN ADMINISTRASI PAUD

URAIAN Vol Sat Harga @ Flafon Realisasi Saldo PPn+PPh Ket

BELANJA BAHAN

1. Alat Tulis Kantor (ATK) 1 Pkt 2.075.000 2.075.000 2.075.000 0 216.931 DD
2. P3K 2 Ktk 62.500 125.000 125.000 0 13.068 DD
3. Alat-alat Kebersihan 1 Pkt 1.800.000 1.800.000 1.800.000 0 188.181 DD
4. Surat Izin OP 1 bk 2.500.000 2.500.000 2.500.000 0 0 DD
5. Paket belajar Murid 50 unit 185.000 9.250.000 9.250.000 0 967.045 DD
6. Pengadaan Baju 100 Stel 450.000 22.500.000 22.500.000 0 2.352.273 DD
7. Jerih/Honor Guru 10 org 2.500.000 30.000.000 17.500.000 12.500.000 0 DD
8. Cetak Raport 50 Bk 7.000 350.000 350.000 0 36.591 DD
9. OP. PAUD 2 SMT 12 Bln 3.000.000 3.000.000 3.000.000 0 313.636 DD
BELANJA MODAL
1. Laptop HP 2 Unit 6.500.000 13.000.000 13.000.000 0 679.545 DD
2. Printer Brother J200 1 Unit 3.061.364 3.061.364 3.061.364 0 261.364 DD
3. Tiang Bendera 1 Unit 2.500.000 2.500.000 2.500.000 0 261.364 DD
4. Gebalan Rumput 15 M2 41.667 625.000 625.000 0 67.341 DD
5. Canopi 1 Unit 18.500.000 18.500.000 18.500.000 0 1.934.091 DD
6. Pintu Pagar 1 Unit 3.500.000 3.500.000 3.500.000 0 365.909 DD
7. Kipas Angin 2 Unit 350.000 700.000 700.000 0 73.181 DD
8. Ayunan Kereta Api 1 Unit 3.200.000 3.200.000 3.200.000 0 0 DD
9. Ayunan Ganda Rantai 1 Unit 2.800.000 2.800.000 2.800.000 0 292.727 DD
10.Ayunan Sorong Bulat 1 Unit 3.000.000 3.000.000 3.000.000 0 313.6360 DD
11.Sorosotan 1 Unit 3.750.000 3.750.000 3.750.000 0 392.045 DD
12.Petak Kubus 1 Unit 3.800.000 3.800.000 3.800.000 0 397.273 DD
13.Rak Tas/Sepatu 36 Loker 3.300.000 3.300.000 3.300.000 0 345.000 DD
14.Dispenser + galon 1 Unit 950.000 950.000 950.000 0 99.319 DD
15.APE Dalam 1 Pkt 8.928.000 8.928.000 8.928.000 0 914.773 DD
16.Baju Batik Guru 10 Stel 400.000 4.000.000 4.000.000 0 418.182 DD
17.Jam Dinding 1 Unit 100.000 100.000 100.000 0 0 DD
18.Poster Presiden dan Wakil 1 Psg 75.000 150.000 150.000 0 0 DD
Jumlah140.964.364128.464.364011.313.320-

 
Support : Editing Website | By Sierra | From Original Template Johny
Copyright © 2016. testediteditedit - All Rights Reserved
Template Created by Creating Website Published by Sierra
Proudly powered by Blogger