Take Of Sheet Rehab PAUD

★ TAKE OF SHEET PEKERJAAN REHAP PAUD LOKASI DUSUN PAYA LOE GAMPONG LAM HASAN KECAMATAN PEUKAN BADA KABUPATEN ACEH BESAR ★

Note: The column-count property is not supported in Internet Explorer 9 and earlier versions.

GAMBAR
URAIAN
VOLUME
SATUAN
HARGA
,,,,,,,,,,,,GAMBAR PEKERJAAN...............
1 M3 BONGKARAN PASANGAN LAMA
Volume Bongkaran = 11.32 M3
Pekerja = 2.00 OH x 77.318.00 = 154.636.36
Tukang = 0.00 OH x 96.095.45 = 0.00
Kepala Tukang = 0.00 OH x 95.400.00 = 0.00
Mandor = 0.10 OH x 84.100 = 8.410.00
Jumlah Volume = 11.32 M3 X 163.046.36 = 1.844.870.00
,,,,,,,,,,,,GAMBAR PEKERJAAN...............
MEMASANG KOSEN KAYU KLAS I
Volume = 3.64 M3
Pekerja = 6.00 OH x 77.318.00 = 463.909.09
Tukang = 18.00 OH x 96.095.45 = 0.00
Kepala Tukang = 2.00 OH x 95.400.00 = 190.800.00
Mandor = 0.30 OH x 84.100 = 0.00
JUMLAH UPAH = 654.709.09
Kosen = 3.643 M3 x 1.092.650.17 = 3.980.348.97
Paku Kayu = 0.12 Kg x 13.254.55 = 1.590.55
Lem kayu = 0.100 Kg x 35.000 = 3.500
JUMLAH BAHAN = 3.985.439.52
,,,,,,,,,,,,GAMBAR PEKERJAAN...............
MEMASANG 1 BH PACOK JENDELA
Volume = 16.00 BH
Pekerja = 0.015 OH x 77.318.00 = 1.159.77
Tukang = 0.00 OH x 96.095.45 = 0.00
Kepala Tukang = 0.00 OH x 95.400.00 = 0.00
Mandor = 0.00 OH x 84.100 = 0.00
Pacok Jendela = 1 Bh x 7.652.73 = 7.652.73
JUMLAH I + II = 8.812.50
Jumlah Volume = 16.00 BH X 8.812.50 = 141.000.00
,,,,,,,,,,,,GAMBAR PEKERJAAN...............
MEMASANG 1 BH HAK ANGIN
Volume = 16.00 BH
Pekerja = 0.015 OH x 77.318.00 = 1.159.77
Tukang = 0.00 OH x 96.095.45 = 0.00
Kepala Tukang = 0.00 OH x 95.400.00 = 0.00
Mandor = 0.00 OH x 84.100 = 0.00
Hak Angin = 1 Bh x 29.767.48 = 29.767.48
JUMLAH I + II = 30.927.25
Jumlah Volume = 16.00 BH X 30.927.25 = 494.936.04
,,,,,,,,,,,,GAMBAR PEKERJAAN...............
MEMASANG 1 BH ENGSEL JENDELA
Volume = 16.00 BH
Pekerja = 0.015 OH x 77.318.00 = 1.159.77
Tukang = 0.00 OH x 96.095.45 = 0.00
Kepala Tukang = 0.00 OH x 95.400.00 = 0.00
Mandor = 0.00 OH x 84.100 = 0.00
Engsel Jendela = 1 Bh x 28.663.00 = 28.663.00
JUMLAH I + II = 29.822.77
Jumlah Volume = 16.00 BH X 29.822.77 = 477.164.36
,,,,,,,,,,,,GAMBAR PEKERJAAN...............
MEMBUAT 1 UNIT CANOPI JENDELA
Volume = 3.00 UNIT
Balok Meranti = 4.152 m2 x 65.000.00 = 269.909.45
Paku kayu = 0.120 Kg x 13.254.55 = 1.590.55
Lem Kayu = 0.100 Kg x 35.000.00 = 3.500.00
JUMLAH = 303.875.00
Jumlah Volume = 3.00 BH X 275.000.00 = 825.000.00
,,,,,,,,,,,,GAMBAR PEKERJAAN...............
1 M2 MEMBUAT SEKAT RUANGAN KELAS
Volume = 274.59 M2
UPAH
Pekerja = 0.100 OH x 77.318.00 = 7.731.82
Tukang = 0.10 OH x 96.095.45 = 0.00
Kepala Tukang = 0.01 OH x 95.400.00 = 954.00
Mandor = 0.00 OH x 84.100 = 0.00
JUMLAH = 8.685.82
JUMLAH 274.59 M2 X 8.685.82 = 2.385.000.00
BAHAN
Balok Kayu 5 x 5 = 0.031 m2 x 68.220.00 = 2.107.73
Paku Kayu = 0.007 Kg x 13.255.00 = 96.76
Triple 9 mm = 0.015 Lbr x 143.591.00 = 2.153.87
Baut 9 mm = 0.004 bh x 2.209.00 = 8.84
Paku Beton = 0.004 bh x 442.00 = 1.77
JUMLAH = 4.368.96
JUMLAH 274.59 M2 X 4.368.96 = 1.199.651
,,,,,,,,,,,,GAMBAR PEKERJAAN...............
1 M2 MEMBERSIHKAN KERIKIL
Volume = 25.13 M2
UPAH
Pekerja = 0.100 OH x 77.318.00 = 7.731.82
Mandor = 0.05 OH x 84.100 = 4.205.00
JUMLAH = 11.936.82
JUMLAH 25.13 M2 X 11.936.82 = 300.000
,,,,,,,,,,,,GAMBAR PEKERJAAN...............
1 M2 PEKERJAAN PENGECATAN TEMBOK
Volume = 236.83 M2
UPAH
Pekerja = 0.02 OH x 77.318.00 = 1.546.36
Tukang = 0.063 OH x 96.095.45 = 6.054.01
Kepala Tukang = 0.006 OH x 95.400.00 = 0.00
Mandor = 0.00 OH x 84.100 = 0.00
JUMLAH = 7.600.38
JUMLAH 236.83 M2 X 7.600.38 = 1.800.000.00
BAHAN CAT TEMBOK
Cat Tembok = 0.108 Kg x 29.602.00 = 3.183.72
Dempul = 0.01 Kg x 22.091.00 = 220.891
JUMLAH = 3.404.63
JUMLAH 236.83 M2 X 3.404.63 = 806.321.00
BAHAN CAT MINYAK
Cat Minyak = 1.221 Kg x 29.602.00 = 36.144.04
Thinner = 0.02 Ltr x 26.509.00 = 530.18
JUMLAH = 36.674.22
JUMLAH 18.21 M2 X 36.674.22 = 658.335.00
ALAT BANTU
Amplas = 10.00 m x 2.651.00 = 26.510.00
Scrabs 3" = 2.00 Bh x 11.045.00 = 22.090.00
Kuas 3" = 4.00 Bh x 19.882.00 = 79.528.00
Kuas 2" = 4.00 Bh x 14.359.00 = 57.436.00
Kuas 1/2" = 4.00 Bh x 12.150.00 = 46.600.00
JUMLAH = 234.164.00
,,,,,,,,,,,,GAMBAR PEKERJAAN...............
KEBUTUHAN BAHAN SENG ONDUINE
Volume = 8.00 lembar
BAHAN
Sengan Onduline = 1.00 Lbr x 57.436 = 57.436
Baut = 6.25 Bh x 700.00 = 4.375.00
JUMLAH = 61.811.00
JUMLAH 8.00 lbr X 61.811.00 = 494.488.00
,,,,,,,,,,,,GAMBAR PEKERJAAN...............
MEMASANG 1 UNIT POMPA AIR
Volume = 1 UNIT
BAHAN
POMPA PANASONIC = 1 UNIT x 717.955.00 = 717.955.00
Soft Kran = 1 Bh x 19.882.00 = 19.882.00
Pipa 3/4 = 4.00 Btg x 27.614.00 = 110.456.00
Elbow 3/4 = 1.00 Bh x 8.836.00 = 8.836.00
Lem Pipa = 1.00 Bh x 13.255.00 = 13.255.00
Seal Tape = 1.00 Bh x 8.836.00 = 8.836.00
JUMLAH = 879.220.00
,,,,,,,,,,,,GAMBAR PEKERJAAN...............
PENGADAAN PENGAMAN POMPA AIR
Volume = 1.00 UNIT
Pengaman Besi = 1.00 UNIT x 497.045.00 = 497.045.00

Tidak ada komentar:

Posting Komentar

 
Support : Editing Website | By Sierra | From Original Template Johny
Copyright © 2016. testediteditedit - All Rights Reserved
Template Created by Creating Website Published by Sierra
Proudly powered by Blogger